After it's installed, London Power Networks has to be told within 28 days, using a short form. It's a notification, not an application. We do it with you.
Great Britain is divided into fourteen distribution licence areas and London is one of them. The operator for it is London Power Networks plc, which is part of UK Power Networks. The same group also runs the Eastern and South Eastern areas, and the outer boroughs sit near the edge of both.
Our map is a working one and we say so. Please check your postcode on the operator's own checker first. You can also ring 105. The call is free, it works anywhere in England, Scotland and Wales, and it puts you through to the company that runs your local distribution network.
Central LondonFlats over shopsThe government's assessment describes it as a short online form that takes five to ten minutes, completed within 28 days of installation. It asks for your name, your email address and the address the panel was installed at. The consumer guidance that comes with the device points you at it.
We word that as something you are asked to do rather than as a deadline with a penalty on the end, because the wording we are quoting describes how the process is meant to work. It applies in Great Britain only. Northern Ireland is outside this system.
If you would rather not do it on your own, we will stay on a call and go through the boxes with you. It is not complicated, but it is easy to forget about.
Registering is usually described as an obligation. It is also how you become eligible to be paid for what you export. The impact assessment says an export tariff would be contingent on registering the device with the distribution network operator. If a tariff is open to you, an unregistered panel will not qualify.
You register a compliant panel after it is installed. You do not apply beforehand and nobody has to approve it. That is what makes this different from a full rooftop system.
The Energy Networks Association raised the change on 1 April 2026. Ofgem approved it on 11 August 2026 and it came in with the rest of the framework on 27 August. Engineering Recommendation G98 Issue 2 Amendment 1 limits a household to one panel. The product specification on its own would allow one per final ring circuit. The network rules are tighter, so one per household is the answer.
Before a manufacturer can put one of these on sale it has to have the device type tested in line with G98, register it on the ENA Type Test Register, and hold confirmation that it was assessed as compliant. The register is public, you can search it without an account, and it marks devices compliant or non-compliant, so anything that failed assessment stays on it.
We only arrange panels that are on the register. If you have already bought something and want to know where it stands, send us the make and model with your enquiry and we will look it up with you.
IndoorsThe socket end of itNo. You register a compliant panel once it is installed. You do not apply in advance and there is nothing to wait for.
The registration is against the installation address. If you take the panel with you, register it again at the new address. Nothing in the guidance stops you.
The network registration has nothing to do with them. The installation does. Permission to fix something to the outside of the building is a separate conversation and it comes first.
Send us the postcode, what the surface is made of and how you hold the property. We will tell you where you stand.
Ask about your buildingTell us the postcode and what sort of building it is.
Name, postcode and email, then what sort of home it is, how you hold it, and where the panel would go. We reply by email with what the rules allow and whose permission you'd need.
We answer by email. We don't share your details and we don't take commission.